---
type: "intblock"
id: "CKURAILWAY"
name: "China-Kyrgyzstan-Uzbekistan Railway"
acronym: "CKU"
url: "https://internacia.io/blocks/ckurailway/"
json: "https://internacia.io/api/v1/blocks/CKURAILWAY.json"
wikidata: "Q4178849"
data_version: "4.2.0"
license: "CC-BY-4.0"
---

# China-Kyrgyzstan-Uzbekistan Railway (CKU)

International railway project under construction linking Kashgar in western China to Andijan in eastern Uzbekistan via Kyrgyzstan. The 532-kilometre corridor spans 158 km in China, 305 km in Kyrgyzstan, and 69 km in Uzbekistan, crossing the Torugart Pass and requiring a break-of-gauge facility at Makmal. A strategic component of China's Belt and Road Initiative, the line is designed to reduce overland transit times between China and Europe and improve Central Asian connectivity. Construction began in 2025 with completion expected by 2029.

- **ID:** CKURAILWAY
- **Status:** Formal
- **Scope category:** Policy forum
- **Geographic scope:** Regional
- **Block types:** Project (project), Transport (transport), Transport Corridor (corridor)
- **Topics:** Transport, Infrastructure
- **Regions:** Central Asia, East Asia
- **Founded:** 2025
- **Official languages:** en, zh, ru
- **Official member count:** 3
- **Last verified:** 2026-11-20

## Notes

The three governments signed a trilateral agreement to proceed in June 2024; project financing was finalised in December 2025. The line will initially be single-track and non-electrified, with electrification and dual-gauge conversion planned in a second phase. Standard gauge (1,435 mm) applies in China and Russian gauge (1,520 mm) in Kyrgyzstan and Uzbekistan. Estimated cost was reported at US$4.7 billion in 2024, funded through Chinese concessional loans, multilateral development financing, and domestic contributions from Kyrgyzstan and Uzbekistan.



## Current participants (3)

| Code | Name | Type | Status | Joined | Route role |
|---|---|---|---|---|---|
| CN | China | Country | Member | 2024-06 | Terminal |
| KG | Kyrgyz Republic | Country | Member | 2024-06 | Transit |
| UZ | Uzbekistan | Country | Member | 2024-06 | Terminal |


## Structure

- **Part of:** Belt and Road Initiative (BRI)

## Most overlapping organizations by current member countries

| ID | Name | Shared | Jaccard |
|---|---|---|---|
| CACGP | Central Asia–China Gas Pipeline | 2 | 0.4 |
| EAG | Eurasian Group on Combating Money Laundering and Financing of Terrorism | 3 | 0.3333 |
| CENTRALASIA | Central Asia | 2 | 0.3333 |
| C5PLUS1 | C5+1 Diplomatic Platform | 2 | 0.2857 |
| CENAPJ | Central Asia plus Japan | 2 | 0.2857 |

## Names

- **Acronyms:** CKU (en)
- **Other names:** Bahnstrecke Kaxgar–Karasuu (de), China-Kyrgyzstan-Uzbekistan Railway (en), Ferrocarril China-Kirguistán-Uzbekistán (es), Кытай-Кыргызстан-Өзбекстан темир жолу (ky), Китайско-Кыргызско-Узбекская железная дорога (ru), 中吉乌铁路 (zh)

## Links

- wikipedia: https://en.wikipedia.org/wiki/China%E2%80%93Kyrgyzstan%E2%80%93Uzbekistan_railway
- wikidata: https://www.wikidata.org/wiki/Q4178849

---

Data: internacia-db v4.2.0 (https://github.com/datenoio/internacia-db/releases/tag/v4.2.0), licensed CC-BY-4.0.
