China-Kyrgyzstan-Uzbekistan Railway (CKU)

International railway project under construction linking Kashgar in western China to Andijan in eastern Uzbekistan via Kyrgyzstan. The 532-kilometre corridor spans 158 km in China, 305 km in Kyrgyzstan, and 69 km in Uzbekistan, crossing the Torugart Pass and requiring a break-of-gauge facility at Makmal. A strategic component of China's Belt and Road Initiative, the line is designed to reduce overland transit times between China and Europe and improve Central Asian connectivity. Construction began in 2025 with completion expected by 2029.

Cite this record

Dateno (Common Data Index). (2026). China-Kyrgyzstan-Uzbekistan Railway (CKU). In Internacia Datasets (Version 4.2.0). Zenodo. https://doi.org/10.5281/zenodo.20706176. https://internacia.io/blocks/ckurailway/

@misc{internacia_china_kyrgyzstan_uzbekistan_railway_cku_,
  author       = {{Dateno (Common Data Index)}},
  title        = {China-Kyrgyzstan-Uzbekistan Railway (CKU)},
  howpublished = {Internacia Datasets, version 4.2.0},
  year         = {2026},
  doi          = {10.5281/zenodo.20706176},
  url          = {https://internacia.io/blocks/ckurailway/}
}
CSL-JSON
{
  "type": "dataset",
  "title": "China-Kyrgyzstan-Uzbekistan Railway (CKU)",
  "author": [
    {
      "literal": "Dateno (Common Data Index)"
    }
  ],
  "container-title": "Internacia Datasets",
  "version": "4.2.0",
  "issued": {
    "date-parts": [
      [
        2026,
        11,
        21
      ]
    ]
  },
  "DOI": "10.5281/zenodo.20706176",
  "URL": "https://internacia.io/blocks/ckurailway/"
}

Key facts

ID
CKURAILWAY
Wikidata
Q4178849
Founded
2025
Official languages
en, zh, ru
Regions
Central Asia, East Asia
Official member count
3
Last verified
2026-11-20

Structure

Part of

Notes

The three governments signed a trilateral agreement to proceed in June 2024; project financing was finalised in December 2025. The line will initially be single-track and non-electrified, with electrification and dual-gauge conversion planned in a second phase. Standard gauge (1,435 mm) applies in China and Russian gauge (1,520 mm) in Kyrgyzstan and Uzbekistan. Estimated cost was reported at US$4.7 billion in 2024, funded through Chinese concessional loans, multilateral development financing, and domestic contributions from Kyrgyzstan and Uzbekistan.

Members and participants

3 current countries and territories (3 member).

  • Member
Countries and territories in China-Kyrgyzstan-Uzbekistan Railway, by membership status. Small territories are shown as dots. Base map: Natural Earth (public domain); boundaries do not imply endorsement.

Accession timeline · Open in the map explorer

Embed this map on another site

An iframe: preview the widget.

<iframe src="https://internacia.io/embed/blocks/ckurailway/" title="China-Kyrgyzstan-Uzbekistan Railway (CKU): membership map (Internacia)" width="100%" height="480" style="border:0" loading="lazy"></iframe>

Or the web component, which sizes the frame to its content:

<script src="https://internacia.io/embed/widget.js" defer></script>
<internacia-embed block="CKURAILWAY"><a href="https://internacia.io/blocks/ckurailway/">China-Kyrgyzstan-Uzbekistan Railway (CKU) on Internacia</a></internacia-embed>

About embeds: options, attribution and privacy.

Download the roster (3 entries, current and former): CSV · JSON

Name Code Status Route role Joined
China CN Member Terminal 2024-06
Kyrgyz Republic KG Member Transit 2024-06
Uzbekistan UZ Member Terminal 2024-06

Membership over time

02.553202420252026

Countries and territories that were members in each year, from the joining and leaving dates: 3 of 3 have a joining date. Play the accession timeline.

Data behind this chart
Year Members
2024 3

Overlapping organizations

By overlap of current member countries (Jaccard index: shared ÷ combined). Compare them.

Organization or grouping Shared members Jaccard
Central Asia–China Gas Pipeline (CACGP) 2 0.40
Eurasian Group on Combating Money Laundering and Financing of Terrorism (EAG) 3 0.33
Central Asia 2 0.33
C5+1 Diplomatic Platform (C5+1) 2 0.29
Central Asia plus Japan (CENAPJ) 2 0.29

Names

Acronyms

  • en CKU

In other languages (6)

  • de Bahnstrecke Kaxgar–Karasuu
  • en China-Kyrgyzstan-Uzbekistan Railway
  • es Ferrocarril China-Kirguistán-Uzbekistán
  • ky Кытай-Кыргызстан-Өзбекстан темир жолу
  • ru Китайско-Кыргызско-Узбекская железная дорога
  • zh 中吉乌铁路

Provenance

Field Source Retrieved Licence
includes gov.cn (State Council English), report on CKU railway commencement ceremony 2026-11-20
includes gov.cn (State Council English), follow-up report on the railway 2026-11-20
other_names Wikidata 2026-06-13 CC0
description official sources 2026-07-29 CC BY-SA 4.0
includes official sources 2026-07-29 CC BY-SA 4.0
founded official sources 2026-07-29 CC BY-SA 4.0
partof official sources 2026-07-29 CC BY-SA 4.0
notes official sources 2026-07-29 CC BY-SA 4.0
acronyms Wikidata 2026-07-29 CC0
scope_category State Council of the People's Republic of China — CKU railway project commencement 2026-09-30