Integrated Power System / Unified Power System (IPS)

Block type

Wide-area synchronous transmission grid connecting the Russian Unified Power System (UPS) with national power networks of Azerbaijan, Belarus, Georgia, Kazakhstan, Kyrgyzstan, Mongolia, Tajikistan, and Uzbekistan. One of the world's largest synchronized electricity systems with approximately 300 GW installed capacity, spanning eight time zones and serving roughly 280 million customers. Evolved from the Soviet unified energy system; the Russian portion is operated by AO SO UPS.

Cite this record

Dateno (Common Data Index). (2026). Integrated Power System / Unified Power System (IPS). In Internacia Datasets (Version 4.2.0). Zenodo. https://doi.org/10.5281/zenodo.20706176. https://internacia.io/blocks/ipsups/

@misc{internacia_integrated_power_system_unified_power_sy,
  author       = {{Dateno (Common Data Index)}},
  title        = {Integrated Power System / Unified Power System (IPS)},
  howpublished = {Internacia Datasets, version 4.2.0},
  year         = {2026},
  doi          = {10.5281/zenodo.20706176},
  url          = {https://internacia.io/blocks/ipsups/}
}
CSL-JSON
{
  "type": "dataset",
  "title": "Integrated Power System / Unified Power System (IPS)",
  "author": [
    {
      "literal": "Dateno (Common Data Index)"
    }
  ],
  "container-title": "Internacia Datasets",
  "version": "4.2.0",
  "issued": {
    "date-parts": [
      [
        2026,
        11,
        21
      ]
    ]
  },
  "DOI": "10.5281/zenodo.20706176",
  "URL": "https://internacia.io/blocks/ipsups/"
}

Key facts

ID
IPSUPS
Founded
1956
Active period
1956 – present
Headquarters
Moscow, Russian Federation
Secretariat
AO SO UPS (System Operator of the Unified Power System), Moscow, Russia
Official languages
en, ru
Regions
Eurasia, Central Asia, Eastern Europe
Legal status
Synchronous grid interconnection
Recognition
Wide-area synchronous transmission grid inherited from the Soviet Union's unified energy system; the Russian Unified Power System (UPS) and interconnected national grids of the Integrated Power System (IPS) operate in parallel synchronous mode; coordinated by AO SO UPS (System Operator of the Unified Power System) under Russian law, with bilateral parallel-operation agreements among participating national grids including the BRELL arrangement (2001–2025) for Belarus, Russia, Estonia, Latvia, and Lithuania
Official member count
9
Last verified
2026-07-13

Notes

The Unified Power System of Russia formed around 1956 when the Center and Middle Volga power systems were interconnected; the Central Asian IPS was established in 1960. After the dissolution of the USSR, the grid continued to operate synchronously across participating states. Ukraine and Moldova disconnected on 24 February 2022 during the Russian invasion of Ukraine and subsequently synchronized with the European grid. The Baltic states (Estonia, Latvia, Lithuania) permanently disconnected on 8 February 2025 under the BRELL agreement to join the Continental Europe Synchronous Area; Kaliningrad now operates as a power island. Armenia operates asynchronously via HVDC links to Georgia and Iran. Turkmenistan disconnected in 2009 and is linked to the Iranian national grid. The system produces around 1,200 TWh annually.

Members and participants

9 current countries and territories (9 member).

  • Member
  • Former member
Countries and territories in Integrated Power System / Unified Power System, by membership status. Small territories are shown as dots. Base map: Natural Earth (public domain); boundaries do not imply endorsement.

Open in the map explorer

Embed this map on another site

An iframe: preview the widget.

<iframe src="https://internacia.io/embed/blocks/ipsups/" title="Integrated Power System / Unified Power System (IPS): membership map (Internacia)" width="100%" height="480" style="border:0" loading="lazy"></iframe>

Or the web component, which sizes the frame to its content:

<script src="https://internacia.io/embed/widget.js" defer></script>
<internacia-embed block="IPSUPS"><a href="https://internacia.io/blocks/ipsups/">Integrated Power System / Unified Power System (IPS) on Internacia</a></internacia-embed>

About embeds: options, attribution and privacy.

Download the roster (16 entries, current and former): CSV · JSON

Name Code Status
Azerbaijan AZ Member
Belarus BY Member
Georgia GE Member
Kazakhstan KZ Member
Kyrgyz Republic KG Member
Mongolia MN Member
Russian Federation RU Member
Tajikistan TJ Member
Uzbekistan UZ Member
Former members and participants (7)
Name Code Status
Armenia AM Former member
Estonia EE Former member
Latvia LV Former member
Lithuania LT Former member
Moldova MD Former member
Turkmenistan TM Former member
Ukraine UA Former member

Overlapping organizations

By overlap of current member countries (Jaccard index: shared ÷ combined). Compare them.

Names

Acronyms

  • en IPS
  • en UPS
  • ru ЕЭС
  • ru ОЭС

In other languages (2)

  • en Integrated Power System / Unified Power System
  • ru Единая энергетическая система

Provenance

Field Source Retrieved Licence
description official sources 2026-07-13
founded official sources 2026-07-13
active_period official sources 2026-07-13
geographic_scope official sources 2026-07-13
legal_status official sources 2026-07-13
recognition_status official sources 2026-07-13
secretariat official sources 2026-07-13
headquarters official sources 2026-07-13
includes official sources 2026-07-13
notes official sources 2026-07-13
acronyms official sources 2026-07-13